For what it's worth, the last time I checked it out (early March), there were no signs of construction at all. I probably won't be down there again until June anyway, hopefully it will be on by then. If not, I'll just keep doing the trip the way I have been.

The Carmel EVGo is probably the charger I hit most often. I have family in Carmel, and often hit the Starbucks while I'm there. Since they only have L1 at their house, I usually charge the car up while enjoying my coffee.
GetOffYourGas is online now  
Sponsored Links
Advertisement
 
post #52 of 65 (permalink) Old 04-25-2019, 09:44 AM
Ste
Member
 
Join Date: Feb 2018
Location: Greater Boston, MA
Posts: 32
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 12 Post(s)
Carmel was probably the best of the four charging stops we made from Ohio to Massachusetts. There were many options there to eat, as you say, as well as the grocery store for snacks. But Newburgh would be a more natural stop and wouldn't be pushing the limits of range in winter (at least along the West to East route. Either way, it's good to have options and redundancy added to these key routes.

Speaking of which, Electrify America just announced another nine partners for fast charge sites in NY, MA, and five other states. These are:

- Kroger (grocery)
- Save Mart Companies (grocery)
- Federal Realty Investment Trust (realty)
- Fulcrum Property (realty)
- ShopCore Properties (realty)
- ValueRock Realty Partners (realty)
- The Macerich Company (realty)
- Washington Prime Group (realty)
- Pan-Cal Corporation (realty)

Don't know much about any of these except Kroger, but it makes sense that they need more partnerships. Cycle 1 finishes up in June and they still have around one-third of the 484 sites to announced (a little under 1/3 are currently live, with a little more than 1/3 identified but still "coming soon"/under construction).

Meanwhile, NYPA is tweeting a lot about EVolveNY but I'm not seeing much in the way of concrete plans. For all their software glitches and growing pains, at least Electrify America is getting units in the ground.
Ste is online now  
post #53 of 65 (permalink) Old 04-26-2019, 12:03 PM
Member
 
Join Date: Mar 2019
Location: Syracuse, NY
Posts: 93
Mentioned: 2 Post(s)
Tagged: 0 Thread(s)
Quoted: 63 Post(s)
NYPA's press releases and website updates make me want to pull my hair out. It seems every time they update the website, the scope has been reduced (fewer chargers) and the schedule has been pushed out. If they keep up this pattern, eventually their plan will be to install 0 chargers and do it by the end of the world.

Any updates on the RG&E location in Rochester? Last update, they were planning on an opening ceremony by the end of April. Here we are at 4/26, and no word yet as far as I can tell. I was really hoping to use that site in May for a day trip to Rochester. It's just under 200 miles, and I'd like to take the Thruway and arrive home with a little buffer.
GetOffYourGas is online now  
Sponsored Links
Advertisement
 
post #54 of 65 (permalink) Old 04-26-2019, 03:31 PM Thread Starter
Senior Member
 
Join Date: Nov 2017
Location: Upstate, NY
Posts: 546
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 254 Post(s)
(Thread Starter)
Quote:
Originally Posted by GetOffYourGas View Post
Any updates on the RG&E location in Rochester? Last update, they were planning on an opening ceremony by the end of April. Here we are at 4/26, and no word yet as far as I can tell. I was really hoping to use that site in May for a day trip to Rochester. It's just under 200 miles, and I'd like to take the Thruway and arrive home with a little buffer.
I have a friend that drives ride share with a Bolt, and he is frequently at the Rochester Airport, very close to that location. He checked two days ago and it is still not up and running, when he waves his chargepoint card at the card reader it says "verboten", yeah it is a Tritium charger and apparently it was configured for German ;-)

I have tried contacting the project lead for it at Avangrid, parent company of RG&E, and have not yet heard back. If I do I will post any updates he is able to share...


Just after posting I received a callback from the Rochester site project manager. Nothing technical holding up the launch, they are waiting on regulatory approval which has proceeded slower than hoped. They don't currently have a definitive date they expect it to be resolved, thus are reluctant to provide a guess. They had been very hopeful that they would have already resolved regulatory issues and then been able to do a launch event in celebration of Earth Day.

The project manager did share that while not yet fully approved, they anticipate the cost to be 10c/min.

Last edited by wonderbolt; 04-26-2019 at 04:26 PM. Reason: Updated status on Rochester site, new information
wonderbolt is online now  
post #55 of 65 (permalink) Old 04-28-2019, 08:50 AM
Member
 
Join Date: Mar 2019
Location: Syracuse, NY
Posts: 93
Mentioned: 2 Post(s)
Tagged: 0 Thread(s)
Quoted: 63 Post(s)
Wow, your friend will get a lot of use out of that charger! That's a great location for a ride share driver.

So the holdup is regulatory approval. Figures. NYS talks the talk about being a "leader" in EVs. But we have so much red tape that we can't even open a charger when the state has helped fund it? Just sad.

10c/min is an incredible deal! EVGo and EA are 30c and 35c respectively (although EA could provide much higher power if your car can take it).
GetOffYourGas is online now  
post #56 of 65 (permalink) Old 04-28-2019, 09:20 AM Thread Starter
Senior Member
 
Join Date: Nov 2017
Location: Upstate, NY
Posts: 546
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 254 Post(s)
(Thread Starter)
Quote:
Originally Posted by GetOffYourGas View Post
Wow, your friend will get a lot of use out of that charger!
Well, yes and no. Apparently to be in the ride share "queue" you must be within the radius of a fairly small circle. The existing level 2 chargers at the Rochester airport are outside of that area as well as this new level 3. I think he is trying to get them (Uber, Lyft) to include the chargers but I have not yet heard if he has been successful.

Last edited by wonderbolt; 04-28-2019 at 10:43 AM.
wonderbolt is online now  
post #57 of 65 (permalink) Old 05-10-2019, 11:50 AM
Ste
Member
 
Join Date: Feb 2018
Location: Greater Boston, MA
Posts: 32
Mentioned: 3 Post(s)
Tagged: 0 Thread(s)
Quoted: 12 Post(s)
Not exactly an update, but I posted a video of our recent road trip from Boston, MA to Cleveland, OH that includes stops to check out the Herkimer, Waterloo, and Erie Electrify America "coming soon" sites: https://youtu.be/DD3qlrVuQEU

Of the three, I think that we'll end up using Waterloo the most. It's a little further off the Thruway but there's much more to do than Herkimer (just a Denny's and Red Roof Inn) and will provide the boost we would need to quickly move on to either Erie or Fredonia, both of which are Walmarts.

Made me ponder the dynamics of charge stops and the importance of amenities nearby... I'd stop for a quick top-up in Herkimer, for example, but would probably stay in the car. In contrast, I'd probably plan a longer stay at Waterloo to do some shopping, for example on our Christmas trips over to Ohio.

Overall, it looks promising for the summer. I also notice that David has been providing updates on the RG&E ChargePoint site in Rochester. Sounds like it's all red tape at the moment, which is disappointing but hopefully means they can go live right away once the paper pushers have their say
Ste is online now  
post #58 of 65 (permalink) Old 05-10-2019, 04:52 PM
Member
 
Join Date: Mar 2019
Location: Syracuse, NY
Posts: 93
Mentioned: 2 Post(s)
Tagged: 0 Thread(s)
Quoted: 63 Post(s)
This image of Herkimer was shared on facebook on May 7th:



So it looks like Herkimer is connected. It is probably waiting for inspection before they turn it on.
GetOffYourGas is online now  
post #59 of 65 (permalink) Old 05-10-2019, 11:28 PM Thread Starter
Senior Member
 
Join Date: Nov 2017
Location: Upstate, NY
Posts: 546
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 254 Post(s)
(Thread Starter)
@Ste thanks for the video and for posting it to this thread, I just watched it and came here to share the link, you beat me to it 🙂. I hear you regarding changing location amenities, I am just impressed that you already make it work, kids and all, with the EA stations you checked on during this trip not yet in service.
wonderbolt is online now  
post #60 of 65 (permalink) Old 05-11-2019, 11:01 AM
Member
 
Join Date: Oct 2017
Location: Rochester, NY
Posts: 47
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quoted: 24 Post(s)
Awesome video! Thanks! Meanwhile, Gil Quiniones is silent on when we will get DCFC at the rest stops.
Heyeph is offline  
Reply

Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page



Posting Rules  
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off

 
For the best viewing experience please update your browser to Google Chrome