To clarify for any other newer owners who may come across this thread, page 234 in the manual describes opening the cover for the bottom holes for DC charging (not AC, or 220v), which is ony for the DC Fast Charging described in the previous posts.
That cover is
orange, due to OSHA requirements that any wiring component
must have an orange insulation as a warning of the higher voltages (over 300V) just like all the orange cabling between the battery, controller, and motor in the front bay. When the first prototype Bolt EV was being road tested, many at the "gm-volt.com" site were asking if the Bolt EV had DC charging. I found one image in 2015 that showed the orange cover. I posted that image, and told the members to look for that orange cover inside the charge port when they went to see the new Bolt EV at a Chevy dealer as evidence that it did have the DC charging feature.
So if any member here wants to buy a Bolt EV or any new EV with DC charging, the SAE J1772 standard mandated that extra orange cover over the DC input.