Chevy Bolt EV Forum banner
  • Hey Guest, welcome to ChevyBolt.org. We encourage you to register to engage in conversations about your Bolt.
1 - 8 of 8 Posts

· Registered
Joined
·
584 Posts
Discussion Starter · #1 ·
Caltrans’ District 9, which serves the east side of the Sierra Nevada mostly along the popular north-south tourist route of Highway 395, expects to have its DCFC stations in operation by early March 2021.


The long-awaited fast charging stations for non-Telsa EVs were originally scheduled for installation in mid 2019.


Until mid-2020 when Electrify America powered up two stations, the entire 330-mile route from Gardnerville to Mojave, California had no non-Tesla fast charging. There was only one Level 2 public charger on the East Side and that had been installed by public-spirited citizens in the small town of Lee Vining outside the east entrance to Yosemite National Park.


The pads and parking for the District 9 stations have been installed for several months with no further activity visible for some time.





However, Caltrans District 9 says that electrical service to stations at Bishop, Coso Junction, and both rest areas in Boron have been installed.


Caltrans expects BTCPower to install the charging kiosks at these stations 16-19 February. After the state fire marshal has inspected the stations, they will be put into service, likely at the end of February or in early March.


The final station at Division Creek between Independence and Big Pine will follow a few weeks later.





Unlike the stations in California’s Central Valley, Caltrans District 9 stations will feature only one charging kiosk. District 6 in the San Joaquin Valley has installed two kiosks at each of its stations with the exception of the southbound rest area on I-5 in the Tejon Pass where they have installed four.


While the EV community has eagerly awaited District 9’s locations, experienced drivers have learned not to rely on single-kiosk stations. Arriving with a low state-of-charge to find the only dispenser available at a station does not work is an EV driver’s nightmare. Fortunately, the Highway 395 corridor now as several Electrify America stations with multiple charging kiosks, two other networks have or are installing kiosks on the south end of the route, and with Caltrans’ stations 30 to 60 miles apart, drivers should be able to find an operating charger before they run out of juice.


It’s likely that the District 9 charge stations will be free like those in the Central Valley. Each BTCPower kiosk will deliver about 43 kW to non-Tesla vehicles.


Tesla vehicles will be able to use Caltrans District 9’ dispensers with an adapter.

 

· Registered
Joined
·
1,592 Posts
Caltrans expects BTCPower to install the charging kiosks at these stations 16-19 February. After the state fire marshal has inspected the stations, they will be put into service, likely at the end of February or in early March.
Thanks Paul - this is excellent news! I am looking forward to seeing a lot more of the east side this summer. I checked on a couple of them last August and there wasn't much to see, so it's nice to see progress being made. I only wish Mono County (and Mammoth in particular) were part of this deployment.
 

· Registered
Joined
·
584 Posts
Discussion Starter · #3 ·
Thanks Paul - this is excellent news! I am looking forward to seeing a lot more of the east side this summer. I checked on a couple of them last August and there wasn't much to see, so it's nice to see progress being made. I only wish Mono County (and Mammoth in particular) were part of this deployment.
Dave,

They need pushed. There's some folks up there who can help and are supportive. If you're in a position to get things done send me an email off line and I'll put you in touch with them. pgipe at igc.org

They're stalled and not going anywhere.

Paul
 

· Registered
Joined
·
5,054 Posts
Until mid-2020 when Electrify America powered up two stations, the entire 330-mile route from Gardnerville to Mojave, California had no non-Tesla fast charging. There was only one Level 2 public charger on the East Side and that had been installed by public-spirited citizens in the small town of Lee Vining outside the east entrance to Yosemite National Park.
To be fair to Electrify America, both their Bishop and Bridgeport sites were up in early 2020. Technically, they were physically installed long before that. Bishop went live in January 2020, but Bridgeport had technical difficulties and didn't go up until the first week of March.
 

· Registered
Joined
·
1,592 Posts
Dave,

They need pushed. There's some folks up there who can help and are supportive. If you're in a position to get things done send me an email off line and I'll put you in touch with them. pgipe at igc.org
Thanks Paul. I'm happy to do anything to help, though I suspect you have a lot more pull in those parts. I've sent you an e-mail.

To be fair to Electrify America, both their Bishop and Bridgeport sites were up in early 2020. Technically, they were physically installed long before that. Bishop went live in January 2020, but Bridgeport had technical difficulties and didn't go up until the first week of March.
Bridgeport was officially opened in November of 2019 (11/21/19). I guess it wasn't actually functional until nearly 4 months later...
 

· Registered
Joined
·
5,054 Posts
Bridgeport was officially opened in November of 2019 (11/21/19). I guess it wasn't actually functional until nearly 4 months later...
Yes, my understanding is that the utilities installed a bad transformer, which needed to be swapped out. It takes months to get a transformer in California in the first place, so that 4 months was probably expedited.
 

· Registered
Joined
·
584 Posts
Discussion Starter · #7 ·
Thanks Paul. I'm happy to do anything to help, though I suspect you have a lot more pull in those parts. I've sent you an e-mail.
Dave,

I haven't received any email. I checked my spam filters as well.

[email protected]

Electric Auto Assoc annual conference is this afternoon. They may have a Q&A and you can push them to help--I do from my end.

Paul
 
1 - 8 of 8 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top